Exterior Painting for Condos

August 11th, 2010

Finished this building at the end of July, it took us a week but the time we spent was well worth it. We also patched holes, fixed some flashing, repaired drywall and sealed an electrical junction box.

Tags: ,
Posted in Drywall, Electrical, Flashing, Painting | Comments (0)

Clubhouse for kids, my kids

July 13th, 2010

I built this clubhouse for my kids over the weekend using sweat and left over lumber from the deck. Donated by Harry and Caroline Spring. Thanks!

Tags:
Posted in Uncategorized | Comments (0)

The Deck is finished

July 13th, 2010

Deck is finished and chihuahua proof (somewhat)

Tags: , , ,
Posted in Carpentry, Decks | Comments (0)

Dental Lab

June 28th, 2010

Dental Lab from January. I’ve patched a partition wall and ceiling that was removed. Set cabinets and countertops. Installed ductwork for burner exhaust. Installed a switch to control equipment in garage. Painted.

Tags: , , , , , , ,
Posted in Dental Lab, Design/Build | Comments (0)

Deck Restructuring

June 28th, 2010

Deck that I’ve been working on restructuring. I’ve kept Joists and Planks in place while replacing the 4×4 columns and railing. I’ve added the staircase, these are pictures of what I’ve done thus far. I should be wrapping it up by the end of the week.

Tags: , , , ,
Posted in Carpentry, Decks | Comments (0)